Map of production flow and logistics / VSM: Value Stream Mapping

Tuesday 16 December 2008
by  PRODUCTIVIX

Interest, objective:

Reduction :
- of the quantities launched per production order
- of your stocks
- of your movements and logistics costs
- of lead times and delays
- of the supply chain and production time cycle.

Model, image : JPEG - 3.6 kb

- of your production line flow
- of the current flow of merchandise and information internally or between your production sites, between national or international warehouses,
- of a future set up of these establishments, or following an envisaged moved, before the decision
- of the blocking or bottleneck points

Target businesses and sectors:

Any production or logistics business

Results:

- proposition balancing the production line, workshop
- identification of necessary areas of improvement
- target the depots to have the biggest lasting impact
- proposition of an organisation target, either in "pull" or "push" flow?
- understanding of the interactions between material flow and information flow
- visualising global rather than one off improvements and share this common vision with the operators, technicians and managers.
- simulation and optimisation of the work shifts.
- training your staff in the analysis
- follow-up of the new installation

Running information:

- Analysis of the internal situation and on your sites
- on site analysis, interviews, measures
- Analysis of the files, analytical cross-over of your CAMM information
- Graphic model of industrial flow, costs, lead times and time cycles, Graphical simulation

Follow up: Weekly assistance and training towards the new organisation

Sharing experience of this method

Remplir la demande de contact, email , rappel , devis


Agenda

<<

2012

>>

<<

Février

>>

Aujourd'hui

LuMaMeJeVeSaDi
303112345
6789101112
13141516171819
20212223242526
2728291234

News items

22 December 2008 - Are quality and productivity mutually incompatible?

Quality is integrated in our missions, be it in engineering / development, at order placement (...)

22 December 2008 - Key success factors of our approach

Measure current performance, indicators In order to be able to decide what to put to work and (...)

22 December 2008 - A DEFINITION of productivity

"In Economics, productivity is the relation between the product and the factors of production (...)

22 December 2008 - Performance gaps, reduction: definitions

Performance gaps Any difference between a desire, and an objective and the reality of the (...)