Customer account following Continuous Improvement operations

Lean - 5S plastic injection - re-work of an order preparation centre
Tuesday 16 December 2008
by  PRODUCTIVIX

"William Piedfort has carried out many projects with Bollé Production as a consultant.

After all our work with him, I can only recommend him. He is competent, efficient and always available"

Introduction of the 5Ss from the 5Ss. Initiation and follow up of a productivity step and continued improvement:
- in a workshop of 15 2x8 presses to begin with.
- then in a workshop cutting glass and assembling spectacles.

In these two projects, the results very quickly exceeded our initial objectives thanks notably to the competence of William Piedfort. He managed to motivate the teams perfectly in the project, especially middle management, who proved to be a very effificent pilot before adopting the step fully and making it part of daily life.

He also carried out a project drawing up the specifications for the re-implantation of a logistics centre and order preparation centre.

Jean Pierre FLEURY- Director of Bollé Production 28th May 2007


navigation titre

in the same section...

Agenda

<<

2012

>>

<<

Février

>>

Aujourd'hui

LuMaMeJeVeSaDi
303112345
6789101112
13141516171819
20212223242526
2728291234

News items

22 December 2008 - Are quality and productivity mutually incompatible?

Quality is integrated in our missions, be it in engineering / development, at order placement (...)

22 December 2008 - Key success factors of our approach

Measure current performance, indicators In order to be able to decide what to put to work and (...)

22 December 2008 - A DEFINITION of productivity

"In Economics, productivity is the relation between the product and the factors of production (...)

22 December 2008 - Performance gaps, reduction: definitions

Performance gaps Any difference between a desire, and an objective and the reality of the (...)